All three bedrooms now have floors. Abby's brother installed them in 2 days and we're grateful for his help. This is the nursery (not much to see yet).
Ben helped Brock with the porch during the Labor Day weekend. They got a lot done working together.
It rains so much here that it's difficult to get things done as fast a we would like. However, the front porch is finished. Yes, the steps are wide. Abby wants enough room to put potted plants on the steps on either side.
The parish is working on the necessary paperwork to finalize. We need a 'permit for permanent service' to give to the electrical company so we can have power. We also need a 'certificate of occupancy' so we can do our final closing. These are being worked on and should be available for us next week (we hope).